Remove Completed Items From Docs
A list holds only what remains. When an item is completed, its line leaves the list entirely: never ~~text~~, a "Done" label or a ticked checkbox.
Why
A list holds only open work, so it reads at a glance.
How To Apply
- A completed item leaves the list for the version's changelog, or for the archive.
- A done ticket is archived, never deleted, so the changelog can link it (Work Tracking).
- A plan file outside a project shrinks the same way: each finished step is deleted.