Skip to content

Remove Completed Items From Docs ​

A list holds only what remains. When an item is completed, its line leaves the list entirely: never ~~text~~, a "Done" label or a ticked checkbox.

Why ​

A list holds only open work, so it reads at a glance.

How To Apply ​

  • A completed item leaves the list for the version's changelog, or for the archive.
  • A done ticket is archived, never deleted, so the changelog can link it (Work Tracking).
  • A plan file outside a project shrinks the same way: each finished step is deleted.